Page: Unassign Spend Down Period Errors
This page displays the validations that have failed when you attempted to unassign Spend Down Met. These validations include: the start date entered must be the start date of the Spend Down period, the start date can be no later than the start date of the current Spend Down period, and/or invalid request for current product delivery status (product delivery status cannot be closed or suspended). |
Click the diagram to manipulate and zoom. Traverse the diagram using
Click-and-Drag motions.
| Fullscreen |
|
Page Level Actions |
Label | Description |
Close | The Close action dismisses the page. |
|
When page is loaded |
Message | Message Catalog | Configurable | Configurable Validation Reference ID |
An Exception occurred as the timeout has been reached and the transaction has been rolled back. | Link | No | |
Cannot modify evidence in this period as it may have an impact on the evidence applied to more recent SpendDown periods. | Link | No | |
Invalid request for current product delivery status request cannot be performed on product delivery with a status of closed or suspended. | Link | No | |
No security implementation is supported for this transaction type. Please contact an Administrator. | Link | No | |
|
When page is submitted |
None |
|
|
When page is submitted |
None |
|
Page ID | ISP_validateUndoApplySpendDownMet |
Location | C:\Users\david\dev\src\esystems-inc\Curam_V8_IS\webclient\components\ISProduct\SpendDown\ISP_validateUndoApplySpendDownMet.uim |
Page Load Interface | ISPSpendDown.validateUndoApplySpendDownMet |
Page Submit Interface | |
Linked From Pages | |