Description
This page allows you to view a list of the grace periods for this case recorded in the system. For CHIP, the effective date of coverage varies across states. If the effective date of coverage is the date of application, a state may also grant a number of days grace period when coverage is allowed to start prior to the application receipt date but not earlier than the beginning of an open enrollment period. A grace period is granted when circumstances beyond the control of the applicant prevents them applying for CHIP prior to the application date. The maximum number of days grace which a state grants is configurable and is stored as application property; the default value is 4 days.
Page Preview
Page Flow Diagram
Click the diagram to manipulate and zoom. Traverse the diagram using Click-and-Drag motions. Fullscreen
Fields
LabelTypeDescriptionMandatory
Receipt DateCURAM_DATEThe application receipt date on which the household member(s) applied for the program(s).No
Good CauseGRACE_PERIOD_GOOD_CAUSEGood cause attributed to granting of grace period.No
Days GrantedGRACE_PERIOD_DAYSThe number of days grace period granted.No
StatusRECORD_STATUS_CODEThe status of the Grace Period, for example, active or canceled. The status code is automatically set by the system. Status is set to active on creation. When a grace period is modified or deleted the status is set to cancelled.No
Links and Actions
Page Level Actions
LabelDescription
NewPress the New button to create a new Grace Period.
Row Level Actions
LabelDescription
EditPress the Edit link to open the Modify Grace Period page.
DeleteYou can press the Delete button to delete the Grace Period record.
Messages
When page is loaded
MessageMessage CatalogConfigurableConfigurable Validation Reference ID
An Exception occurred as the timeout has been reached and the transaction has been rolled back.LinkNo
When page is submitted
None
Related Entities
When page is loaded
CaseHeader
GracePeriod
When page is submitted
None
Technical Information
Page IDISP_listGracePeriod
LocationC:\Users\david\dev\src\esystems-inc\Curam_V8_IS\webclient\components\ISProduct\Evidence\CHIP\Administration\GracePeriod\ISP_listGracePeriod.uim
Page Load InterfaceCHIPAdministration.listGracePeriodsByCaseID
Page Submit Interface
Linked From PagesDelete Grace Period (Administration_cancelGracePeriod), Edit Grace Period (Administration_modifyGracePeriodFromList)